Tuesday 23 August 2011

Salam Aidilfitri

Salam Aidilfitri kepada semua. Maaf zahir dan batin.

** Mulai 5 Sept 2011, akan diadakan kelas-kelas malam bagi menggantikan kelas-kelas yang telah dicancelkan. Harap anda semua bersedia dengan pengangkutan.

Cadangan Waktu : 8.00pm - 9.30pm
Cadangan Lokasi : LR3
Cadangan Tarikh : akan dimaklumkan kemudian

Monday 15 August 2011

Phase 1 : Ideation

Ideation Presentation berlangsung sepanjang minggu 7 dan minggu Exam.
Pastikan semua ahli kumpulan ada semasa presentation.
Dan mohon untuk buat temu janji terlebih dahulu :)

Good Luck for your Mid Semester exam

Monday 8 August 2011

Project Two - Short Drama

Students are required to produce a Short Drama (maximum 10-15 minutes). All the footage should be self-recorded using Digital Video Camera.

There are 6 (SIX) pre-production processes before going for production process, which students should submit
01. Ideation / Proposal - Submit Week 7
02. Script
03. Storyboard
04. Scout Location
05. Shot List
06. Shooting Board

There will be a lecture on pre-production process in Chapter 8.

This is a group project which should consist of 4-6 students

All documents submitted WILL NOT be return for further correction or references. Please make sure you have ANOTHER COPY of your documents

The project should follow the following requirements
01. DVD Hard Cover Case
02. CD Label
03. A3 Poster
04. Video Size : 720x576, 25 fps
05. Video File Format : MPEG2 (DVD), Burn as DVD Video
06. Below are the video format
      - Bar & Tones
      - Group Profile / Group Slate
         ** Production Name
         ** Title
         ** Category : Short Drama
         ** Duration
         ** Subject : TMD 2053 [Digital Audio Video]
      - Universal Counting Leader
      - Title Sequence
      - Product
      - Ending Sequence
      - The Making

Sunday 7 August 2011

Class Planner Week 6

Class
Chapter 6 & Revision 01

Lab
Project 02 Briefing
Introduction to Adobe Premiere

If you want to bring your own Notebook/Laptop, please do install
01. Adobe Premiere CS3

* Installing different version of software may caused problems such as different Interface and different file supports.

Monday 1 August 2011

Ramadhan Timetable

H01 08.30am - 09.20am (Waktu Biasa 08.30am - 09.30am)
H02 09.20am - 10.10am (Waktu Biasa 09.30am - 10.30am)
H03 10.10am - 11.00am (Waktu Biasa 10.30am - 11.30am)
H04 11.00am - 11.50am (Waktu Biasa 11.30am - 12.30pm)
H05 11.50am - 12.40pm (Waktu Biasa 12.30pm - 01.30pm)
H06 12.40pm - 01.30pm (Waktu Biasa 01.30pm - 02.30pm)
H07 01.30pm - 02.20pm (Waktu Biasa 02.30pm - 03.30pm)
H08 02.20pm - 03.10pm (Waktu Biasa 03.30pm - 04.30pm)
H09 03.10pm - 04.00pm (Waktu Biasa 04.30pm - 05.30pm)
H10 04.00pm - 04.50pm (Waktu Biasa 05.30pm - 06.30pm)